High Density High Precision Forged Pure Tungsten Pipe

FOB Reference Price:Get Latest Price
$65.00 - $88.00 / Kilograms | 1 Kilogram/Kilograms (Min. Order)
Thickness:
1~20mm
Outer Diameter:
6mm min
Lead Time:
Quantity(Kilograms) 1 - 100 101 - 250 251 - 500 >500
Est. Time(days) 15 22 35 Negotiable
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shaanxi, China
Brand Name:
CYNM
Model Number:
customized
Supply Ability
Supply Ability:
5000 Kilogram/Kilograms per Month Tungsten tube/pipe
Packaging & Delivery
Packaging Details
stanard export packagin.
Port
shenzhen,xi'an,tianjin
Lead Time :
Quantity(Kilograms) 1 - 100 101 - 250 251 - 500 >500
Est. Time(days) 15 22 35 To be negotiated
Product Description

Specifications:        


Name: Tungsten pipe
Appearance: silver grey metal luster
Density:19.35g/cm3
Purity: W≥99.95%
Quality standard: GB/T 4187-1984 (tungsten rod) ASTM F288-90
Supply state: sintering or processing
Dimension: Φ6mm min*WT 1.0mm min*L 800mm max


Application:               


● Parts of Electric Light Source and Electron Tube .
● Medical Facilities.
● Obstruction of Radiation and Interference.
● Heat Shields of High Temperature Furnace.
● Heat Elements of High Temperature Furnace.
● Structures of High Temperature Furnace.
● Evaporation Boats.     


Chemical Composition:    

Grade 
Tungsten content
Content of impurity elements
Total content 
Each content
W1
≥99.95%
≤0.05%
≤0.01%
W2
≥99.92%
≤0.08%
≤0.01%
Products Show
Our Company

We specialize in offering raw materials forms including rod, wire, sheet, plate, bar, nuts, and threaded rod. We also provide a diverse range of customized products per customers' requirements. Typical parts include: heating elements, crucibles, molybdenum liner, precision-machined components, evaporation sources, target, material trays, heat shield and electrode.

Packaging&Delivery
1. Packing with moisture-proof paper;
2. Packing with Kraft paper;
3. Packing with foam plastics in all sides;
4. Packing products in standard wooden cases.
5.Usually we send the good Via Fedex Door to Doors, it need 2~6days.warehouse to doors,the Lead time is 7~11 day.
Contact us

 More details, please contact us, Rita will solve the problem with you together.

 E-mail: sales007(@)chengyimetal.com